SDDS Wiring-Guide

Access the technical instructions, specifications, and practical examples to interpret data points in the SDDS/ ESG SDDS and ensure consistent reporting.

Field level

Start of investment period date

Topic: Critical Dates | Field Level: Vehicle | Label: cd_start_investment_period_date | Indicator ID: 2.3

Industry Mapping:

The beginning of the investment period as defined in the vehicle documentation during which the vehicle can acquire assets.

Data Type Date
Values DD/MM/YYYY
Example 21/06/2023
Reference Field -
INREV Guideline ID -
INREV Index reference -
External reference -
GDD reference D0464