SDDS Wiring-Guide

Access the technical instructions, specifications, and practical examples to interpret data points in the SDDS/ ESG SDDS and ensure consistent reporting.

Field level

Final capital closing date

Topic: Critical Dates | Field Level: Vehicle | Label: cd_final_capital_closing_date | Indicator ID: 2.2

Industry Mapping:

As defined in the vehicle documentation, the date of the final closing occurs at the end of the equity raising period set by the manager when the vehicle is closed to new commitments.

Data Type Date
Values DD/MM/YYYY
Example 19/09/2025
Reference Field -
INREV Guideline ID -
INREV Index reference -
External reference -
GDD reference -