The estimated Operating Expense (OPEX) and Capital Expenditure (CAPEX) investments needed per floor area (ESG1.6.1: sqm/sqf) in order to achieve the net zero targets set. (e.g., 2030, 2040, 2050) Please indicate the currency in the comment box.
ESG SDDS Wiring-Guide
Estimated cost to achieve target year on the pathway that are deemed relevant to the strategy (Amount in currency/area/yr)
"This indicator reflects the estimated cost per unit of floor area required to align assets with the relevant decarbonisation pathway by the chosen target year (e.g., 2030, 2040, 2050).
Estimates may be derived from:
• Building-level retrofit plans (e.g., energy efficiency upgrades, HVAC replacement, insulation, lighting);
• Technical studies (e.g., energy audits, engineering reports);
• Portfolio-level modelling (e.g., scenario analysis based on CRREM or national roadmaps).
Costs should include both OPEX (e.g., increased maintenance or operational changes) and CAPEX (e.g., equipment replacement, renewable energy installation) and be expressed per square metre or square foot in line with ESG1.6.1."
| Data Type | Double |
| Values | ≥ 0 |
| Example | 34,567.00 |
| Reference Field | Asset data - Sum of RAL4.3 (Estimated OPEX/CAPEX to achieve climate change targets (Amount in currency / area)) |
| INREV Guideline ID | ENV51 |
| INREV Index reference | - |
| External reference | - |
| GDD reference | - |